Details


Planning Application Ref: 2239/19/ARM
Applicant Name: Mr J Grant Wainhomes (South West) Holdings Limited
Description: Application for reserved matters relating to details of layout, scale,appearance and landscaping and discharge of conditions 3 (phasing) and18 (tree protection) following outline approval 57/2472/14/O for 198 new homes, public open space with associated road infrastructure, access, parking and other utilities and services.
Address: Land at SX 647 563 Off Rutt Lane West & East of Ivybridge Park & Ride Ivybridge
Application Date: 08 August 2019
Officer Name: Patrick Whymer Target Determination Date: 27 February 2020
Decision Date: 27 February 2020
Conditional Approval

261 Documents found

Plans, drawings and material submitted to the Council are protected by the copyright acts (Section 47, 1988 Act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Supporting information - Notice of Commencement - 23/11/2020
Decision notice - 27/02/2020
External consultee repsonse - CM (web)1 - External - Highways - 24/02/2020
Extension of Time agreed - email - Eot to 27/02/2020 - 23/02/2020
Supporting information - Email from Applicant re Flow Controls - 19/02/2020
Supporting information - 3rd party re highways - 17/02/2020
Town or Parish comment - 08/02/2020
Internal consultee response - Trees - 31/01/2020
Revised plan - # 0709-AMS Rutt Lane Ivybridge _2020 - 30/01/2020
Revised plan - # 0709-AIA-rutt Lane, Ivybridge_2020 - 30/01/2020
Supporting information - # Ecological Appraisal - Ref: 0709-ECIA-LW - 28/01/2020
Internal consultee response - Biodiversity - 28/01/2020
Supporting information - # Lighting Impact Assessment Project 4030 Rev 01 - Illume Design 23.01.20 - 27/01/2020
Revised plan - Boundary Treatmeants and Materials Plan Parcel 2 - drwg: 1330/P11-2 Rev G - 27/01/2020
Town or Parish comment - 24/01/2020
Revised plan - 12372_P01c_Ivybridge_Soft Landscape Proposals_Sheet 2_2020 01 15 - 16/01/2020
Revised plan - 12372_P01c_Ivybridge_Soft Landscape Proposals_Sheet 1_2020 01 15_compressed - 16/01/2020
Site notice - 14/01/2020
Revised plan - 1330_Drg Issue [2020.01.13] - 14/01/2020
Revised plan - # 1330_P14C Ecology Plan ALL - 14/01/2020
Revised plan - # 1330_P15B Phase Plan - 14/01/2020
Revised plan - 0741 S278 Proposed Works - 14/01/2020
Revised plan - 12372_P01b_Ivybridge_Soft Landscape Proposals_2019 12 23_Sheet 2 - 14/01/2020
Revised plan - 12372_P01b_Ivybridge_Soft Landscape Proposals_2019 12 23_Sheet 1_compressed - 14/01/2020
Revised plan - # 1330_P12-2F Surface Treatments 2of2 - 14/01/2020
Revised plan - # 1330_P13-1K Rendered Plan 1 - 14/01/2020
Revised plan - # 1330_P13-3K Rendered Plan Both - 14/01/2020
Revised plan - # 1330_P10-2J Site Layout 2 - 14/01/2020
Revised plan - # 1330_P10-3P Site Layout as Proposed Both - 14/01/2020
Revised plan - # 1330_P11-1J Materials Plan 1of2 - 14/01/2020
Revised plan - # 1330_P11-2F Materials Plan 2of2 - 14/01/2020
Revised plan - # 1330_P12-1J Surfaces Treatments 1of2 - 14/01/2020
Revised plan - # 1330_P10-1N Site Layout 1 - 14/01/2020
Revised plan - # 1330_WoSA_2D[Wordsworth] - 14/01/2020
Revised plan - # 1330_WoSA_3C[Wordsworth] - 14/01/2020
Revised plan - # 1330_Wr_1C[Wren] - 14/01/2020
Revised plan - 1330_Wr_3C[Wren] - 14/01/2020
Revised plan - # 1330_St_1C[Stephenson]_Plan - 14/01/2020
Revised plan - # 1330_St_2C[Stephenson]_Eles - 14/01/2020
Revised plan - # 1330_Tv_1C[Trevethick] - 14/01/2020
Revised plan - # 1330_Tv_2C[Trevethick] - 14/01/2020
Revised plan - # 1330_Tv_3B[Trevethick] - 14/01/2020
Revised plan - # 1330_Wo_1C[Wordsworth] - 14/01/2020
Revised plan - # 1330_WoSA_1C[Wordsworth] - 14/01/2020
Revised plan - 1330_Sh_1D [Shakespeare] - 14/01/2020
Revised plan - # 1330_Hl_2 [Handel 4B6P] - 14/01/2020
Revised plan - # 1330_Jn_1C [Jenner] - 14/01/2020
Revised plan - # 1330_Jn_3C [Jenner] - 14/01/2020
Revised plan - # 1330_Nt_1D [Newton] - 14/01/2020
Revised plan - # 1330_Nt_3C [Newton] - 14/01/2020
Revised plan - # 1330_El_2 [Elgar 3B5P] - 14/01/2020
Revised plan - # 1330_Et_3C [Eton] - 14/01/2020
Revised plan - 1330_Ha_1D [Hanbury] - 14/01/2020
Revised plan - # 1330_Ha_3D [Hanbury] - 14/01/2020
Revised plan - 1330_Da_3C [Davy] - 14/01/2020
Revised plan - # 1330_Dn_3 [Dalton] - 14/01/2020
Revised plan - # 1330_El_1C [Elgar 3B5P] - 14/01/2020
Revised plan - # 1330_Da_2C [Davy] - 14/01/2020
Revised plan - # 1330_Cn_1C [Chinley 1B2P] - 14/01/2020
Revised plan - # 1330_Cz_1C [Carnglaze] - 14/01/2020
Revised plan - # 1330_Bl_2D [Bell] - 14/01/2020
Revised plan - # 1330_Bn_1C [Britten 2B4P] - 14/01/2020
Revised plan - 1330_Bn_2 [Britten 2B4P] - 14/01/2020
Revised plan - # 1330_Cd_1 [Cavendish] - 14/01/2020
Revised plan - # 1330_Cd_3C [Cavendish] - 14/01/2020
Revised plan - # 1330_Ch_1C [Churchill] - 14/01/2020
Revised plan - # 1330_Ch_2 [Churchill] - 14/01/2020
Revised plan - # 1330_Bc_3C [Brancaster] - 14/01/2020
Revised plan - # 1330_BcSA_1C [BrancasterSA] - 14/01/2020
Revised plan - # 1330_BcSA_3C [BrancasterSA] - 14/01/2020
Revised plan - # 1330_Bl_1D [Bell] - 14/01/2020
Revised plan - # 1330_Bc_2C [Brancaster] - 14/01/2020
Revised plan - # 1330_Bc_1C [Brancaster] - 14/01/2020
Revised plan - # 1330_P18D-Proposed Street Scenes 2of2 - 17/12/2019
Revised plan - # 1330_P17D-Proposed Street Scenes 1of2 - 17/12/2019
Revised plan - # 1330_P13-2F Rendered Plan 2 - 17/12/2019
Revised plan - 1330_P13-3H Rendered Plan ALL - 17/12/2019
Revised plan - 1330_P14B Ecology Plan ALL - 17/12/2019
Revised plan - 1330_P11-2F Materials Plan 2of2 - 17/12/2019
Revised plan - 1330_P12-1H Surfaces Treatments 1of2 - 17/12/2019
Revised plan - 1330_P12-2F Surface Treatments 2of2 - 17/12/2019
Revised plan - 1330_P13-1H Rendered Plan 1 - 17/12/2019
Revised plan - 1330_P10-3M Site Layout ALL - 17/12/2019
Revised plan - 1330_P11-1G Materials Plan 1of2 - 17/12/2019
Revised plan - 1330_P10-2J Site Layout 2 - 17/12/2019
Revised plan - 1330_P10-1L Site Layout 1 - 17/12/2019
Revised plan - 1330_WoSA_3C[Wordsworth] - 17/12/2019
Revised plan - 1330_Wr_1C[Wren] - 17/12/2019
Revised plan - # 1330_Wr_3D[Wren] - 17/12/2019
Revised plan - 1330_Tv_2C[Trevethick] - 17/12/2019
Revised plan - 1330_Tv_3B[Trevethick] - 17/12/2019
Revised plan - 1330_Wo_1C[Wordsworth] - 17/12/2019
Revised plan - 1330_WoSA_1C[Wordsworth] - 17/12/2019
Revised plan - 1330_WoSA_2D[Wordsworth] - 17/12/2019
Revised plan - 1330_P15A Phase Plan - 17/12/2019
Revised plan - # 1330_Pr_3- [Priestly] - 17/12/2019
Revised plan - # 1330_Sh_1E [Shakespeare] - 17/12/2019
Revised plan - 1330_St_1C[Stephenson]_Plan - 17/12/2019
Revised plan - 1330_St_2C[Stephenson]_Eles - 17/12/2019
Revised plan - 1330_Tv_1C[Trevethick] - 17/12/2019
Revised plan - 1330_Jn_3C [Jenner] - 17/12/2019
Revised plan - 1330_Nt_1D [Newton] - 17/12/2019
Revised plan - 1330_Nt_3C [Newton] - 17/12/2019
Revised plan - 1330_Jn_1C [Jenner] - 17/12/2019
Revised plan - 1330_Et_3C [Eton] - 17/12/2019
Revised plan - 1330_Ha_1D [Hanbury] - 17/12/2019
Revised plan - # 1330_Ha_1E [Hanbury] - 17/12/2019
Revised plan - 1330_Hl_2 [Handel 4B6P] - 17/12/2019
Revised plan - # 1330_Da_3D [Davy] - 17/12/2019
Revised plan - 1330_Dn_3 [Dalton] - 17/12/2019
Revised plan - 1330_Drg Issue [2019.12.09] - 17/12/2019
Revised plan - 1330_El_1C [Elgar 3B5P] - 17/12/2019
Revised plan - 1330_El_2 [Elgar 3B5P] - 17/12/2019
Revised plan - 1330_Da_2C [Davy] - 17/12/2019
Revised plan - 1330_Cd_3C [Cavendish] - 17/12/2019
Revised plan - 1330_Ch_1C [Churchill] - 17/12/2019
Revised plan - 1330_Ch_2 [Churchill] - 17/12/2019
Revised plan - 1330_Cn_1C [Chinley 1B2P] - 17/12/2019
Revised plan - 1330_Cz_1C [Carnglaze] - 17/12/2019
Revised plan - 1330_Bl_2D [Bell] - 17/12/2019
Revised plan - 1330_Bn_1C [Britten 2B4P] - 17/12/2019
Revised plan - # 1330_Bn_2 [Britten 2B4P] - 17/12/2019
Revised plan - 1330_Cd_1 [Cavendish] - 17/12/2019
Revised plan - 1330_Bl_1D [Bell] - 17/12/2019
Revised plan - 1330_BcSA_3C [BrancasterSA] - 17/12/2019
Revised plan - 1330_Bc_2C [Brancaster] - 17/12/2019
Revised plan - 1330_Bc_3C [Brancaster] - 17/12/2019
Revised plan - 1330_BcSA_1C [BrancasterSA] - 17/12/2019
Revised plan - 1330_Bc_1C [Brancaster] - 17/12/2019
Revised plan - 1330_P15A Phase Plan - 17/12/2019
Supporting information - 1330_Drg Issue [2019.12.09] - 17/12/2019
Internal consultee response - Environmental Services - 25/11/2019
Revised plan - 1330/SK203 Rev A - Site Layout as Proposed Parcels 1 and 2 - 12/11/2019
Revised plan - 1330/SK201 Rev A - Site Layout as Proposed Parcel 1 - 12/11/2019
Revised plan - 1330/SK202 Rev A - Site Layout as Proposed Parcel 2 - 12/11/2019
Internal consultee response - OSSR - 16/10/2019
Supporting information - Housing mix statement - 30/09/2019
Town or Parish comment - 24/09/2019
Supporting information - Housing Mix Statement - 20/09/2019
Supporting information - DCC Highways document - Tree Pit in Paved Area (TP/1 & TP/2) - 18/09/2019
Internal consultee response - Affordable Housing - 10/09/2019
Internal consultee response - Trees - 05/09/2019
Town or Parish comment - 05/09/2019
Revised plan - Soft Landscape Proposals - Planting plan - Sheet 1 - DRWG: 12372/P01 - Sheet 1 Rev A - 30/08/2019
Revised plan - Soft Landscape Proposals - Planting plan - Sheet 2 - DRWG: 12372/P01 - Sheet 2 Rev A - 30/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 6 - 29/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 5 - 29/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 4 - 29/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 3 - 29/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 2 - 29/08/2019
General plan - 0741 Planning EXTERNAL WORKS - RMA-FFL Sketch Sheet 1 - 29/08/2019
Supporting information - 0709 AIA Rutt Lane Ivybridge - 22/08/2019
Supporting information - 18429 GICAR Rutt Lane Ivybridge - 22/08/2019
Supporting information - # 1330_DAS PLANNING - 22/08/2019
Supporting information - 0709 Rutt Lane PEAR 31052019 - 22/08/2019
Supporting information - 0741 Rutt Lane Ivybridge Drainage Maintenance Plan - 22/08/2019
Supporting information - 0741 Rutt Lane Ivybridge CEMP - 22/08/2019
Supporting information - 0709 AMS Rutt Lane Ivybridge - 22/08/2019
General plan - 1330_Wr_1B Wren - 22/08/2019
General plan - # 1330_Wr_2B Wren Type 2 - 22/08/2019
General plan - 1330_Wr_3B Wren Type 3 - 22/08/2019
General plan - 1330_WoSA_3B Wordsworth Side Aspect Type 3 - 22/08/2019
General plan - 1330_WoSA_2B Wordsworth Side Aspect Type 2 - 22/08/2019
General plan - 1330_Tv_1B Trevithick - 22/08/2019
General plan - 1330_Wo_1B Wordsworth - 22/08/2019
General plan - 1330_WoSA_1B Wordsworth Side Aspect Type 1 - 22/08/2019
General plan - # 1330_Sh_2B Shakespeare Type 2 - 22/08/2019
General plan - 1330_St_1B Stephenson PLANS - 22/08/2019
General plan - 1330_St_2B Stephenson ELEVATIONS - 22/08/2019
General plan - # 1330_St_3B Stephenson PLANS - 22/08/2019
General plan - # 1330_St_4B Stephenson ELEVATIONS - 22/08/2019
General plan - # 1330_P20_Existing site sections 2of2 - 22/08/2019
General plan - # 1330_Pr_1B Priestly Type 2 - 22/08/2019
General plan - 1330_Sh_1B Shakespeare - 22/08/2019
General plan - 1330_P17C Proposed site sections 1of2 - 22/08/2019
General plan - 1330_P18C-Proposed Street scenes 2of2 - 22/08/2019
General plan - # 1330_P19_Existing site sections 1of2 - 22/08/2019
General plan - 1330_P13-2B Rendered Site Plan Parcel 2 - 22/08/2019
General plan - 1330_P15-Phase Plan - 22/08/2019
General plan - 1330_P11-1B Materials and Boundary Treatments Parcel 1 - 22/08/2019
General plan - 1330_P11-2B Materials and Boundary Treatments Parcel 2 - 22/08/2019
General plan - 1330_P12-1B Surface Treaments Plan Parcel 1 - 22/08/2019
General plan - 1330_P12-2B Surface Treaments Plan Parcel 2 - 22/08/2019
General plan - 1330_P13-1B Rendered Site Plan Parcel 1 - 22/08/2019
General plan - # 1330_P02-3A Site Layout as Existing Parcels 1 and 2 - 22/08/2019
General plan - 1330_P10-1D Site Layout as Proposed Parcel 1 - 22/08/2019
General plan - 1330_P10-2D Site Layout as Proposed Parcel 2 - 22/08/2019
General plan - 1330_P10-3D Site Layout as Proposed Parcels 1 and 2 - 22/08/2019
General plan - # 1330_Nt_2B Newton Type 2 - 22/08/2019
General plan - 1330_Nt_3B Newton Type - 22/08/2019
General plan - # 1330_P01A_Site Location Plan - 22/08/2019
General plan - # 1330_P02-1A Site Layout as Existing Parcel 1 - 22/08/2019
General plan - # 1330_P02-2A Site Layout as Existing Parcel 2 - 22/08/2019
General plan - 1330_Dv_2B Davy Type 2 - 22/08/2019
General plan - 1330_Dv_3B Davy Type 3 - 22/08/2019
General plan - 1330_Et_1B Eton Type 3 - 22/08/2019
General plan - 1330_Ha_1B Hanbury - 22/08/2019
General plan - # 1330_Ha_2B Hanbury Type 3 - 22/08/2019
General plan - 1330_Jn_1B Jenner - 22/08/2019
General plan - # 1330_Jn_2B Jenner Type 2 - 22/08/2019
General plan - 1330_Jn_3B Jenner Type 3 - 22/08/2019
General plan - 1330_Nt_1B Newton - 22/08/2019
General plan - 1330_Br_1B Brancaster Type 1 - 22/08/2019
General plan - 1330_Br_2B Brancaster Type 2 - 22/08/2019
General plan - 1330_Br_3B Brancaster Type 3 - 22/08/2019
General plan - 1330_Ch_1B Churchill - 22/08/2019
General plan - 1330_Cv_1B Cavendish Type 3 - 22/08/2019
General plan - 1330_Cz_1B Carnglaze - 22/08/2019
General plan - # 1330_Cz_2B Carnglaze Type 2 - 22/08/2019
General plan - # 1330_Da_1B Dalton - 22/08/2019
General plan - # 1330_Dv_1B Davy - 22/08/2019
General plan - 1330_1B2P_1B Chinley - 22/08/2019
General plan - 1330_2B4P_1B Britten - 22/08/2019
General plan - 1330_3B5P_1B Elgar - 22/08/2019
General plan - # 1330_4B6P_1B Handel - 22/08/2019
General plan - 1330_Bl_1B Bell - 22/08/2019
General plan - 1330_Bl_2B Bell Type 2 - 22/08/2019
General plan - 1330_Br(SA)_1B Brancaster Side Aspect - 22/08/2019
General plan - 1330_Br(SA)_2B Brancaster Side Aspect Type 2 - 22/08/2019
General plan - 1330_Br(SA)_3B Brancaster Side Aspect Type 3 - 22/08/2019
General plan - # 1330 P41A Single Garage Side Gable - 22/08/2019
General plan - # 1330 P42A Double Garage - 22/08/2019
General plan - # 1330 P43A Double Garage Shared - 22/08/2019
General plan - # 1330 P40A Single Garage Forward Gable - 22/08/2019
General plan - 0741-SK-102-C - 22/08/2019
General plan - 0741-UD-101-A - 22/08/2019
General plan - 0741-PHL-402-A - 22/08/2019
General plan - 0741-PHL-403-A - 22/08/2019
General plan - 0741-PHL-404-A - 22/08/2019
General plan - 0741-RP-001-A - 22/08/2019
General plan - 0741-RP-002-A - 22/08/2019
General plan - 0741-RP-003-A - 22/08/2019
General plan - 0741-PHL-101-A - 22/08/2019
General plan - 0741-PHL-102-A - 22/08/2019
General plan - 0741-PHL-401-A - 22/08/2019
General plan - 0741-PDL-201-A-compressed - 22/08/2019
General plan - 0741-PDL-202-A - 22/08/2019
General plan - 0741-GA-007-A - 22/08/2019
General plan - 0741-HW-001-B - 22/08/2019
General plan - 0741-HW-002-B - 22/08/2019
General plan - 0741-GA-005-A - 22/08/2019
General plan - 0741-GA-006-A - 22/08/2019
General plan - 0741-GA-001-A - 22/08/2019
General plan - 0741-GA-002-A - 22/08/2019
General plan - 0741-GA-003-A - 22/08/2019
General plan - 0741-GA-004-A - 22/08/2019
General plan - 0741-ATR-301-A - 22/08/2019
General plan - 0741-ATR-302-A - 22/08/2019
General plan - 0741-ATR-201-A - 22/08/2019
General plan - 0741-ATR-202-A - 22/08/2019
General plan - 0741-ATR-013-B - 22/08/2019
General plan - 0741-ATR-014-B - 22/08/2019
General plan - 0741-ATR-004-B - 22/08/2019
General plan - 0741-ATR-011-B - 22/08/2019
General plan - 0741-ATR-012-B - 22/08/2019
General plan - 0741-ATR-002-B - 22/08/2019
General plan - 0741-ATR-003-B - 22/08/2019
General plan - 0741-ATR-001-B - 22/08/2019
General plan - 1330 P13 3F Rendered plan - 14/08/2019
Application form - FW: Rutt Lane 2239/19/ARM - 14/08/2019
Tamar EMS form - letter - 15/07/2019